Update mirgecom downstream testing to use integrated test runner.#292
Open
MTCam wants to merge 7 commits intoinducer:mainfrom
Open
Update mirgecom downstream testing to use integrated test runner.#292MTCam wants to merge 7 commits intoinducer:mainfrom
MTCam wants to merge 7 commits intoinducer:mainfrom
Conversation
Owner
|
Thanks for this contribution. Analogous CI code exists in, at least, arraycontext, pytato, and loopy. What's provided here looks a bit "non-final", and I'd prefer not to have to continue making changes in multiple places as things get finalized. Instead, I'd prefer if mirgecom had a script entrypoint for downstream tests, so that upstream package can defer the policy decision of what should constitute downstream CI can be deferred to mirgecom. |
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Use mirgecom integrated test runner to run lazy, examples, and production testing. Plugs a production testing hole.